18 MEI 2015
Construction of Main Gate 1
04 MEI 2015
Soil Filling Works next to paving block area
06 APR 2015
Installation of Pipe 0,8†(3 section) from boiler to SWRO
04 APR 2015
Land Clearing and Soilfilling Works at Putra Bandar
18 FEB 2015
Construction of Weight Bridge and Unloading & Filling Station Site A &Site B
14 FEB 2015
Base Course & Filling Works at Slope Protection Area
14 FEB 2015
Construction of Oil Trap Works, Ladder R of Trafo 3 and Access Road for WWTP Area
19 JAN 2015
Construction of Access Road and Paving Block for Block Water Tower at Site B Mess Area
19 JAN 2015
Construction of Drainage (Phase II) and Retaining Wall
12 JAN 2015
Steel Construction for Coal Warehouse Building at Boiler 20 TPH Area
07 JAN 2015
Access, Paving Block and Box Culvert Works at Parking Area
07 JAN 2015
Construction of Steel for Boiler Building 20 TPH, 16 TPH, 12 TPH
02 JAN 2015
Steel Construction at KCP 02 and Pipe Rack from Clarifier Area to Electrical Room 1 at Non Bonded Area
02 JAN 2015
Steel Construction for Boiler House 23M x 36 M at Side B Area